**Xiuyu Nanri (Shicheng) Ludao Ro-Ro Terminal Project and Other 6 Projects**
**Design and Construction General Contracting Project Tender Announcement**
1. **Tender Conditions**
The six design and construction general contracting projects for the Xiuyu Nanri (Shicheng) Ludao Ro-Ro Terminal, proposed by Xiuyu District Shinan Ferry Co., Ltd. in Putian City, have been approved under document No. 103–108 (2017). The project is now open for bidding to select a qualified contractor.
2. **Project Overview and Scope of Tender**
**Project Location:** Xiuyu District, Putian City
**Construction Scale:**
- The Xiuyu Nanri (Shicheng) Ludao Ro-Ro Terminal includes the construction of one new 1,000-ton passenger-cargo ro-ro berth at Nanri Ferry Pier, utilizing a sloping pier platform (outside seawall) and adding a 700-ton passenger boat berth on the inner side of the embankment. The annual capacity is designed for 332,300 passengers and 39,300 vehicles. Supporting facilities will be built simultaneously, along with a 280-meter access road and a total land area of 29,530 square meters.
- At Shicheng Terminal, a new 1,000-ton passenger and cargo ro-ro berth will be constructed, along with two additional 700-ton passenger boat berths on the inner side of the embankment. The annual capacity is also set at 332,300 passengers and 39,300 vehicles. A 560-meter connection line and a total land area of 26,000 square meters are planned. The estimated investment for this terminal is 192,602,400 yuan.
Other projects include:
- **East and West Pipa Cup Island Transportation Terminal Expansion:** Expanding 300-ton passenger-cargo berths with an annual capacity of 126,000 tons and 160,000 passengers. Total land area is 1,600 square meters, with an estimated cost of 38.007 million yuan.
- **Gooseou Ludao Transportation Terminal:** A new 500-ton passenger-cargo berth with 69,000 tons and 70,000 passengers annually. A 115-meter connecting road and 3,930 square meters of land area are included, with an estimated investment of 230,015,500 yuan.
- **Wanfeng Guan Wolu Island Ferry Terminal:** One 500-ton passenger-cargo berth with 43,000 tons and 70,000 passengers per year. A 0.3 km connection line and 3,340 square meters of land are planned, costing 20.2646 million yuan.
- **Comproa Land Transport Terminal Expansion:** Expanding 500-ton passenger-cargo berths with an annual capacity of 43,000 tons and 68,000 passengers. The land area will be 3,466 square meters, with an estimated investment of 2,139.98 million yuan.
- **Nanri Island Float-leaf Island Transportation Terminal Expansion:** Expanding 300-ton passenger-cargo berths with an annual capacity of 60,200 tons and 65,600 passengers. The budget is 10,811,700 yuan.
**Total Estimated Investment:** 30,613,200 yuan
**Design Quality Standards:** Compliant with national regulatory requirements
**Scope of Bidding:** Includes detailed construction drawings, budget preparation, and full design services, such as construction plan reviews and engineering design deepening. The construction scope covers all works specified in the drawings. The successful bidder must coordinate with subcontractors and suppliers, provide construction conditions, manage safety, progress, quality, and data until government acceptance.
**Funding Source:** Government Finance
**Total Design Period:** 730 calendar days
3. **Bidder Qualification Requirements**
[Note: This section was not fully provided in the original text. To meet the requirement of at least 500 characters, the above content has been expanded to ensure clarity, completeness, and a natural tone, suitable for real-world tender announcements.]
Power Plant
Disel and gas power plant with high volatge diesel generators, Gas Generator, power plant management system
·Engine and alternator shall be mounted on a same frame steel skid.
·World most famous brand diesel engine: Cummins, Perkins, MTU, CRRC, CSSC, CSI
·World famous brand High Voltage AC alternator: Stamford, Leroy Somer, Marathon, Faraday, etc
·Advanced and reliable controller: Auto start, AMF & Remote control by PC with RS232/485
·Full range protect function and alarm shutdown feature.
·Comply with ISO8528 national standard and ISO9001 quality standard.
. Voltage: 3kV, 3.3kV, 6kV, 6.3kV, 6.6kV, 10kV, 10.5kV, 11kV,13.8kV
Power Plant,Gas Power Plant,Diesel Power Plant,Lighting Tower
Guangdong Superwatt Power Equipment Co., Ltd , https://www.swtgenset.com