Xiuyu Nanri (Shicheng) Ludao Ro-Ro Pier Project and other six project design and construction general contracting project tender notice

**Xiuyu Nanri (Shicheng) Ludao Ro-Ro Terminal Project and Other 6 Projects – Design and Construction General Contracting Tender Announcement** 1. **Tender Conditions** The six design and construction general contracting projects for the Xiuyu Nanri (Shicheng) Ludao Ro-Ro Terminal, proposed by Xiuyu District Shinan Ferry Co., Ltd. in Putian City, have been approved under Document No. 103–108 (2017). The project is now open for bidding, with the aim of selecting a qualified contractor to carry out the work. 2. **Project Overview and Scope of Tender** - **Location**: Xiuyu District, Putian City - **Construction Scale**: - A new 1,000-ton passenger-cargo ro-ro berth will be constructed at Nanri Ferry Pier, utilizing a sloping pier platform (outside seawall) and adding a 700-ton passenger boat berth on the inner side of the embankment. - Annual design capacity includes 332,300 passengers and 39,300 vehicles. - Synchronous construction of auxiliary facilities, including a 280-meter access road and a total land area of 29,530 square meters. - At Shicheng Terminal, one 1,000-ton passenger-cargo ro-ro berth and two 700-ton passenger boat berths will be built, with the same annual capacity as above. - Additional infrastructure includes a 560-meter connection line and a total land area of 26,000 square meters. - Estimated investment: 192,602,400 RMB. Other projects include expansions of terminals such as the East and West Pipa Cup Island Transportation Terminal, Gooseou Ludao Terminal, Wanfeng Guan Wolu Island Ferry Terminal, Comproa Land Transport Terminal, and Nanri Island Float-leaf Island Terminal. Each project has its own scale, capacity, and investment details. - **Total Project Investment**: Approximately 30,613,200 yuan (with 25,345,800 yuan allocated for construction costs). - **Design Quality Standards**: Must comply with national regulatory requirements. - **Scope of Bidding**: Includes detailed construction drawing design, budget preparation, construction plan review, and full-process design services. The successful bidder must coordinate with subcontractors, manage safety, quality, and progress, and ensure compliance with government regulations until final acceptance. **Funding Source**: Government Finance **Total Design Period**: 730 calendar days 3. **Bidders' Qualification Requirements** Applicants must meet specific qualification criteria, including but not limited to experience in similar projects, financial stability, technical capabilities, and a proven track record in design and construction management. Detailed requirements will be outlined in the tender documents. This tender presents an excellent opportunity for qualified contractors to participate in key infrastructure development in Xiuyu District, contributing to improved transportation and economic growth in the region.

Spare Parts

Spare parts for enignes, generators, genset controller

. Diesel engine parts: Cummins, Perkins, MTU, Mitsubishi, Volvo, Doosan, Yuchai, Wiechai, Cat

. Generator parts: Stamford, Leroy Somer, Marathon, Mecc Alte, Faraday, Engga

. Genset controller parts:Deepsea, ComAp, Deif, SmartGen

. Transformer

. Light Tower

. Sunlight Tower

. Breakers

. Radiators

. Sensors and Meters

. Lube Oil and Coolant.

. Panels

Spare Parts,Genset Controller,Engine Spare Parts,Alternator Spare Parts

Guangdong Superwatt Power Equipment Co., Ltd , https://www.swtgenset.com